Worked upstairs this weekend. Finally closed off the two attick access areas with custom doors. Custom to this house means home made. The access at the top of the stairs is hinged at the top and swings up into the roof joists. I haven't completed the mechanism to hold the door up. I will use the old window sash weights and some pullies to assist in opening the door. The other door swings out into the hallway.
The rest of the weekend was spent getting dry wall boards installed in the unfinished areas. I still have approximately 20 more sheets of drywall to install. Most of it is for filling in odd shapes sections, window frame area and interior room walls. This has been somewhat complicated due to the way the original lumber was installed. There are places where the old lumber is not plumb or warped. All of the insulation is complete and I can already feel a diference.